Operations approval

Operations decides on each breakdown with production impact and priority in view.

Operations manager's approval queue showing a breakdown with what the fault is, the likely causes and the production impact.
Operations approves with the likely fault and production impact in view.

What it does

Every reported breakdown goes to the operations manager first. They see the machine, the fault, the batch and product, and set the production impact and priority. They approve it so maintenance can start, or reject it with a reason that goes back to the reporter.

The steps

  1. 1Open the waiting report.
  2. 2Set the production impact and the priority.
  3. 3Approve, or reject with a reason.

What each role sees

Operations manager
Reports waiting for approval, with batch and product.
Line operator
Whether the report was approved or rejected, and why.
Maintenance manager
Approved jobs arriving for review.

Follow one breakdown end to end.

The demo needs no login. Switch roles at the top and take TP-01 from the stop to the signed report.