QA batch decision and line clearance
Hold, release, deviation or reject, e-signed, before the line is cleared.

What it does
When the fault was ticked as possibly touching the product, QA must make a batch decision before the line can be cleared: hold, release, deviation or reject. The decision is signed electronically on the same record as the repair. QA then clears the line.
The steps
- 1Open the verified job with its batch and product.
- 2Read the fault, the repair and the operator's verification.
- 3Record the batch decision: hold, release, deviation or reject.
- 4Sign it, then clear the line.
What each role sees
- QA
- Jobs waiting for a batch decision and line clearance.
- Operations manager
- When the line is cleared to run.
Follow one breakdown end to end.
The demo needs no login. Switch roles at the top and take TP-01 from the stop to the signed report.